Gemini 11 Titan 2

Gemini 11 Titan 2 Launch Vehicle

Rendezvous mission with the AGENA as target

September 1966

1/60th scale model.

IMG_4681

IMG_4682

Download the model :

TITAN II

Assembly instructions :


Gemini GAATV

Gemini Atlas Agena Target Vehicle

AtlasD launcher of the agena target for the Gemini 11 mission. Launched shortly before the titan 2. September 1966

1/60th scale model.

IMG_4722

IMG_4719

Download the model :

AGENA

Assembly instructions :


GEMINI VII

Complete ship

Long duration mission from 4 to 18 December 1965

With Frank F. Borman II and James A. Lovell Jr.

1/24th scale model

page de garde

IMG_3951

IMG_3964

IMG_3962

Download the model :

GEMINI VII

Assembly instructions :

Apollo 7 AS205

Saturn 1B

11 October 1968 _ 22 October 1968

First manned flight of the Apollo spacecraft with 3 human on board.

1/60 th scale model

IMG_1131

IMG_1134

IMG_1136

IMG_1135

IMG_1126

IMG_1120

Download the model :

SATURN 1B

Assembly instructions :


Super Heavy Launchers N1 (H1) :

Launcher of the Soviet lunar program of the 60s. Unfortunately, the 4 launch attempts were 4 failures and the program was stopped in 1974.

This program was not officially communicated until after the fall of the Soviet Union in 1990.

1/60th scale model of the L3 mission, the first launch attempt on February 21, 1969.

1ere

IMG_4988

IMG_4985

IMG_4983

IMG_4981

IMG_4971

IMG_4976

ensemble

Download the model :

Lanceur N1

Assembly instructions :


Apollo 15 AS510

Saturn V

26 July _ 7 August 1971

Apollo 15 was the fourth mission to land men on the Moon. This mission was the first flight of the Lunar Roving Vehicle that astronauts used to explore the geology of the Hadley Rille/Apennine region.

1/60th scale model

lancement

IMG_0744

05

08

04

02

06

02

05

02

04

05

07

02

complet


DELTA IV HEAVY

Exploration Flight Test 1

December 5, 2014

The unmanned Orion spacecraft makes two Earth orbits, with a large apogee for the second orbit and a high-speed atmospheric reentry (20,000 mph or about 32,000 km / h)

delta IV heavy

IMG_1851

IMG_1841

IMG_1842

IMG_1823

Download the model :

DELTA IV HEAVY

Assembly instructions :


SLS Block 1 Crew

Launcher of the Orion capsule of the Artemis program

the SLS program follows the STS program since the cessation of shuttle launches.

the Artemis program calls for the return of man (and a woman) to the surface of the moon in 2025.

the solid rocket boosters are those of the STS program with an extra element.

the CORE STAGE is an evolution of the external tank of the STS program

the RS25 engines are those of the shuttle as well.

the launch of the ARTEMIS 1 mission took place on Wednesday, November 16, 2022. The mission was successfully completed.

1/60th model

380 pieces removable in 11 elements

1ere

IMG_4730

IMG_4701

IMG_4396

IMG_4623

IMG_4699

IMG_4724

IMG_4725

Download the model :

ARTEMIS 1

Assembly instructions :


Tintin rocket

1/60th scale model.

83 cm high.

Getting into a puzzle, there are no assembly instructions !

IMG_8072

IMG_8079

IMG_8082

IMG_8087

Download the model :


compteur.js.php?url=fy%2FinJWYI3g%3D&df=