Gemini 11 Titan 2 Launch Vehicle
Rendezvous mission with the AGENA as target
September 1966
1/60th scale model.
Gemini Atlas Agena Target Vehicle
AtlasD launcher of the agena target for the Gemini 11 mission. Launched shortly before the titan 2. September 1966
1/60th scale model.
Complete ship
Long duration mission from 4 to 18 December 1965
With Frank F. Borman II and James A. Lovell Jr.
1/24th scale model
11 October 1968 _ 22 October 1968
First manned flight of the Apollo spacecraft with 3 human on board.
1/60 th scale model
Launcher of the Soviet lunar program of the 60s. Unfortunately, the 4 launch attempts were 4 failures and the program was stopped in 1974.
This program was not officially communicated until after the fall of the Soviet Union in 1990.
1/60th scale model of the L3 mission, the first launch attempt on February 21, 1969.
26 July _ 7 August 1971
Apollo 15 was the fourth mission to land men on the Moon. This mission was the first flight of the Lunar Roving Vehicle that astronauts used to explore the geology of the Hadley Rille/Apennine region.
1/60th scale model
Download the model :
Assembly instructions :
December 5, 2014
The unmanned Orion spacecraft makes two Earth orbits, with a large apogee for the second orbit and a high-speed atmospheric reentry (20,000 mph or about 32,000 km / h)
Launcher of the Orion capsule of the Artemis program
the SLS program follows the STS program since the cessation of shuttle launches.
the Artemis program calls for the return of man (and a woman) to the surface of the moon in 2025.
the solid rocket boosters are those of the STS program with an extra element.
the CORE STAGE is an evolution of the external tank of the STS program
the RS25 engines are those of the shuttle as well.
the launch of the ARTEMIS 1 mission took place on Wednesday, November 16, 2022. The mission was successfully completed.
1/60th model
380 pieces removable in 11 elements
1/60th scale model.
83 cm high.
Getting into a puzzle, there are no assembly instructions !
Download the model :